Museum East Wing Addition
Project #: | 18-05 |
Detailed Status: | Complete |
Building Gross Sq. Ft: | 22,552 |
Campus: | MINI传媒 Lubbock |
Location: | 3301 4th Street |
|
Board Approved Budget: | $12,000,000 |
Adjusted Budget: | $12,000,000 |
|
Construction Start Date: | 06.04.2021 |
Project Completion: | 12.29.2022 |
|
Program Director: | Rick Richeda |
Contractor: | Western Builders |
Design Professionals: | MWM Architects |
CM Agent: | N/A |
|
OPTION 3-Basement and first floor
Basement
Collections Storage Room-large open space featuring both compactor shelves and an area for three-dimensional art works to be stored safely.
Collections Research Laboratory/Work Room-flexible work space with direct access to the Collections Storage Room that will be used for collection care and maintenance as well as research. Features of the room include a sink with both hot and cold water and plenty of work surfaces.
Other basement/project considerations-connector hallways to existing basement, HVAC, cooling tower, freight elevator, and a telecom room.
First Floor
Public Gallery-engagement space for museum visitors to view the Arnold Collection featuring movable walls and high quality lighting that especially highlights 3D art.
Other first floor considerations-required public spaces including but not limited to restrooms, elevator access, and a PA system to enhance public events. |
Fatal error: Uncaught Error: Call to undefined function each() in \\TECHSHARE.MINI传媒.EDU\AMBASSADOR\fpc\projects\project-status.php:590
Stack trace:
#0 {main}
thrown in \\TECHSHARE.MINI传媒.EDU\AMBASSADOR\fpc\projects\project-status.php on line 590