Terry Fuller Petroleum Engineering Research Building
Project #: | 11-09 |
Detailed Status: | Project Closed |
Building Gross Sq. Ft: | 43,886 |
Campus: | MINI传媒 Lubbock |
Location: | 807 Boston Avenue |
|
Board Approved Budget: | $22,800,000 |
Adjusted Budget: | $22,823,028 |
Budget Summary: | Increase of $23,028 from Operations to create loop on the water system to enhance water pressure on the fire lines in the area. |
Final Cost: | $22,805,748 |
|
Construction Start Date: | 01.24.2012 |
Project Completion: | 01.15.2014 |
|
Program Director: | Rick Richeda |
Contractor: | Vaughn Construction |
Design Professionals: | Kirksey Architecture |
Artist: | Juanjo Novella |
Art Title: | Fountain |
|
MINI传媒 and the Edward E. Whitacre Jr. College of Engineering constructed a new 43,886 sq.ft, LEED Certified, 2-story Petroleum Engineering Research Building. The new facility matches the architectural style of the historic Engineering Key and demonstrates Leadership in Environmental and Energy Design. Spaces incorporated into the project include faculty and administrative offices, conference rooms, classrooms, graduate and undergraduate areas, library, and engineering laboratories. In addition, the project constructs 71 new parking spaces adjacent to the new facility.
The project included asbestos abatement and partial demolition of the existing 38,000 sq.ft. Exercise Sciences Center (ESC) with the associated utility tunnel. |
Fatal error: Uncaught Error: Call to undefined function each() in \\TECHSHARE.MINI传媒.EDU\AMBASSADOR\fpc\projects\project-status.php:590
Stack trace:
#0 {main}
thrown in \\TECHSHARE.MINI传媒.EDU\AMBASSADOR\fpc\projects\project-status.php on line 590